How long does a whole-home renovation take in Evergreen, CO?
Most whole-home mountain renovations take 9 to 24 months from first call to completion, including design, permitting, and construction. Design and permitting can take as long as the build itself.
What are the steps in a whole-home renovation?
The seven phases are: intro conversation, design and planning, budgeting and scope, permitting, demolition and structural work (including excavation and sitework if the project involves an addition), build-out and finishes, and the final walkthrough.
Do I need permits to renovate a home in the Colorado foothills?
Yes — even basic renovations need permits in the Colorado foothills. Structural changes, additions, septic work, and wildfire (WUI) requirements each add their own review, and foothills projects may cross Jefferson County, Clear Creek County, or Idaho Springs jurisdictions.
What is design-build and why does it matter for mountain renovations?
Design-build means design and construction run as one collaborative team rather than two separate contracts. Crafted Space Co. doesn’t employ designers in-house — we partner with architecture, interior design, and engineering teams we’ve worked with for years and bring them in from the start. You get the same benefits: fewer gaps between design and execution, better cost control, and a single point of accountability, without managing the relationships yourself.
Is renovating a home harder than building new?
Often, yes. Renovation means working around an existing structure and its unknowns, which requires more experience and project management than a ground-up build on a clean site.